Customization: | Available |
---|---|
After-sales Service: | Site Installation |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HDPE sheet extrusion machine for Geocell
HDPE sheet production line for Geocell1). Geocell introduction:
Geocell Production Line is used to produce plastic geocell, which is a kind of geo-product with alveolate and three-dimensional structure which processed the thermoplastic sheet by the ultrasonic welding machine and other methods.
Its special three-dimensional structure makes it possible to form the different viscous force, different reinforcing bar intensity and different thickness of cushion. It is widely used in the fields of the reinforcing of railway, strengthening roadbed, protect of field bank, building of earth protection wall, and so on.
Equipment list | |||
1.single screw extruder | 2. Hydraulic mesh changing system | ||
3. Die mold | 4.Electric control system | ||
5.Three roller calender | 6. Roll temperature regulator | ||
7. Transmission and side cutting | 8.Haul off machine | ||
9. Length Measurement | 10. Cutter | ||
11. Extruder vacuum feeder | 12. Driers |
Summary | |||
Suitable resin | PP/PE/PS/ABS | ||
Sheet width | 400-2000mm(customized) | ||
Sheet thickness | 0.2-2mm(as requirement) | ||
Capacity | 150-1000kg/h | ||
Power supply | 380V 3phase 50HZ |
1. After the machines are finished, the seller will test all machines before shipment. If the buyer can not come to test the machine,
we will test the machines and send the sample to buyer.
2..After shipment, the seller will send one or two technicians to the buyer's factory to help the buyer install the machine and train
workers for buyer.
3. We will supply all electricity drawing, machine installation drawing.
4. When make shipment, we will put some spare electricity parts for free, like the barrel hearers, thermcouples, breakers, relays,
and other items which is easier broken.